Proven case study

Denmark Wind Components

Certification audit passed first time; turbine commissioning on schedule; zero field failures at 12 months; program extended to $9.1M.

Four key decisions on this page

Company work archive

Denmark Wind Components: project record

Certification bodies required full material traceability; two prior suppliers failed the documentation audit, delaying turbine commissioning.

Buyer and project
A Copenhagen, Denmark wind-energy group managing turbine O&M and new installations.
Products and scope
Wind turbine components; bolts, bearings, and structural castings; 240 references, 12,000 parts. Program value $7.4M.

What LifaSourcing.com did

  1. Qualified 4 manufacturers with EN 10204 3.1 material certificates.

  2. Built a lot-level traceability system from melt to final part.

  3. Coordinated third-party audits to certification-body standards.

  4. Structured delivery to match turbine assembly schedules.

Recorded result

Certification audit passed first time; turbine commissioning on schedule; zero field failures at 12 months; program extended to $9.1M.

Company record

A proven case study from LifaSourcing.com's historical work archive. The result above records the status reached in this project.

Client identities, supplier contacts and confidential commercial terms are withheld from this public company record.

Discuss your projectAll proven case studies
Ask LIFA AI