Wind-energy component sourcing for Denmark Material traceability through to the final part

LIFA coordinated four manufacturers and lot-level traceability for a Danish wind-energy program, supporting first-time audit acceptance.

Four key decisions on this page

Proven client project

Wind-energy component sourcing for Denmark

LIFA coordinated four manufacturers and lot-level traceability for a Danish wind-energy program, supporting first-time audit acceptance.

The buyer
A Copenhagen, Denmark wind-energy group managing turbine O&M and new installations.
The product scope
Wind turbine components; bolts, bearings, and structural castings; 240 references, 12,000 parts. Program value $7.4M.

What needed to change?

Certification bodies required full material traceability; two prior suppliers failed the documentation audit, delaying turbine commissioning.

How LIFA managed the work

  1. We qualified 4 manufacturers with EN 10204 3.1 material certificates.

  2. We built a lot-level traceability system from melt to final part.

  3. We coordinated third-party audits to certification-body standards.

  4. We structured delivery to match turbine assembly schedules.

Project results

Certification audit passed first time; turbine commissioning on schedule; zero field failures at 12 months; program extended to $9.1M.

Proven LIFA project

From our company project database, with the work, approvals and results shown together.

What this project shows

Material records needed to follow each lot from initial material to finished component. Delivery sequencing then matched the turbine assembly schedule.

Support for a similar project

Share your product specifications, quantity, destination and target date. If you already have a supplier, tell us which part of the order needs support.

Request a project review

Client identities, supplier contacts and confidential commercial terms are withheld from this public company record.