How are BOM, components, firmware, ratings and interfaces frozen before approval?
Freeze the Electronics Accessories BOM, approved manufacturers and part numbers, alternates, firmware version, ratings, interfaces, drawings, critical dimensions, and configuration identifiers before sample or production approval. Use controlled revisions and written deviation requests. Recheck testing, performance and labeling whenever a change affects the approved configuration.







