LED Lighting UAE: project record
A shipment failed CE/ERP documentation checks and sat 3 weeks in customs; lumen depreciation exceeded 20% at 6,000 hours on some fixtures; warranty disputes with end clients were rising.
- Buyer and project
- A Dubai, UAE trading company supplying commercial lighting to fit-out contractors and facilities managers.
- Products and scope
- LED panels (600×600), downlights, and high-bay lights; commercial grade.
What LifaSourcing.com did
Screened 12 manufacturers; verified CE, ERP, and SASO compliance files.
Arranged photometric testing (LM-79) and lumen-maintenance review.
Negotiated 5-year warranty terms with defined replacement thresholds.
Built a compliant-product catalog for pre-sales documentation.
4 compliant suppliers engaged; customs holds eliminated; warranty disputes down 80%; lighting sales up 26% in two quarters as pre-sales documentation closed deals faster.
A proven case study from LifaSourcing.com's historical work archive. The result above records the status reached in this project.
Client identities, supplier contacts and confidential commercial terms are withheld from this public company record.
