LIFA client project

Solar storage system sourcing for Austria Cell and system checks before installation

LIFA coordinated battery-supplier checks and sample testing for an Austrian solar-storage program covering 2,400 installed systems.

Four key decisions on this page

Proven client project

Solar storage system sourcing for Austria

LIFA coordinated battery-supplier checks and sample testing for an Austrian solar-storage program covering 2,400 installed systems.

The buyer
A Graz, Austria installer of residential and commercial solar with storage.
The product scope
Battery storage systems; 5 kWh to 20 kWh, 2,400 systems. Program value $2.9M.

What needed to change?

Battery safety is regulated (CE, UN38.3); a prior supplier's certificates were invalid, forcing a costly retrofit of 400 systems.

How LIFA managed the work

  1. We verified CE and UN38.3 certification with issuing bodies.

  2. We qualified 2 battery manufacturers with test-lab access.

  3. We ran cell-level and system-level testing on samples.

  4. We structured phased deliveries to installation bookings.

Project results

2,400 systems installed with a 0.2% field failure rate; zero certificate issues; the program renewed at $3.6M.

Proven LIFA project

From our company project database, with the work, approvals and results shown together.

What this project shows

Certificate verification and physical testing served different purposes. Cell-level findings and complete-system checks both informed the installation supply plan.

Support for a similar project

Share your product specifications, quantity, destination and target date. If you already have a supplier, tell us which part of the order needs support.

Request a project review

Client identities, supplier contacts and confidential commercial terms are withheld from this public company record.

Request a project reviewExplore all client projects