Proven case study

Austria Solar Storage

2,400 systems installed with a 0.2% field failure rate; zero certificate issues; the program renewed at $3.6M.

Four key decisions on this page

Company work archive

Austria Solar Storage: project record

Battery safety is regulated (CE, UN38.3); a prior supplier's certificates were invalid, forcing a costly retrofit of 400 systems.

Buyer and project
A Graz, Austria installer of residential and commercial solar with storage.
Products and scope
Battery storage systems; 5 kWh to 20 kWh, 2,400 systems. Program value $2.9M.

What LifaSourcing.com did

  1. Verified CE and UN38.3 certification with issuing bodies.

  2. Qualified 2 battery manufacturers with test-lab access.

  3. Ran cell-level and system-level testing on samples.

  4. Structured phased deliveries to installation bookings.

Recorded result

2,400 systems installed with a 0.2% field failure rate; zero certificate issues; the program renewed at $3.6M.

Company record

A proven case study from LifaSourcing.com's historical work archive. The result above records the status reached in this project.

Client identities, supplier contacts and confidential commercial terms are withheld from this public company record.

Discuss your projectAll proven case studies
Ask LIFA AI